How It Works
Less is more
Lay It. Leave It. digging is obsolete.
- Roll It Out: Lay the Fisher Sediment Barrier flat on the surface. Skip the trenches, and leave the soil completely undisturbed.
- Passive Filtration: Water flows through smoothly while suspended sediment is captured and held on-site automatically.
- Rapid Exit: When the project is fully completed and it is time to remove it you just lift it up. Roll it out of the way with zero trenches to backfill and absolutely zero structural mess left behind.
- Peak Compliance: Maintain flawless Ontario and municipal standards with drastically less maintenance and a lean crew of just 3 or 4 workers.
How It Works
Installation
place it. stake it. done.
Fisher Sediment Barrier provides a straightforward surface-installation process:
- Position the barrier at a 45°–90° angle to water flow.
- Follow the natural contours of the terrain.
- Maintain continuous contact with the ground.
- Overlap adjoining sections by 12–24 inches.
- Install stakes approximately 10 feet apart.
- Do not stretch the barrier.
.
1
Place It
Without trenching or excavation position Fisher Sediment Barrier tightly along the terrain.
2
Stake It
Anchor the barrier in place with wooden stakes, some are provided. If you need more they are available for purchase.
3
Done
Inspect it to ensure and maintain compliance.